Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13655771
| No.13655771
- Product Categories
- Friendly Links
- home > Supply > Building embedded parts _ Peter Kennedy Building Materials (certified) _ embedded parts
| Information Name: | Building embedded parts _ Peter Kennedy Building Materials (certified) _ embedded parts |
| Published: | 2015-04-20 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Embedded parts and embedded tube is different: embedded parts are left in the structure set up by steel bars and anchoring components used to connect structural members and non-structural elements fixed purpose. For example, after doing step fixed (such as doors, windows, walls, water pipes, gas pipes, etc.) with connections. The number of connections in the concrete structure and the steel parts. Embedded pipe: stay in the structure of a tube (common steel cast iron pipe or PVC pipe) used to wear a tube or leave openings for equipment service channel. For example, in the late wearing various pipelines (such as the strength of electric, water, gas, etc.). Commonly used in the concrete wall beam pipe hole reserved. Embedded parts installed substandard quality control measures: (1) construction technology embedded parts embedded parts walls connected with the main structure, the construction should be buried at the main structure, and ensure that it is firmly planted, position accuracy; when there is no pre-conditions Buried had to use embedded parts rear, rear buried pieces should be required to do the pull-out strength test, by testing to determine their capacity, only after passing the job. (2) strict measurement of embedded parts positioning. Well embedded parts deviations record pole embedded parts, eliminate cumulative error; indeed embedded parts are missing, the position error is too large, the reinforcement should take corrective measures. Production process according to the design requirements (3) were embedded parts, welders have operating permits walls embedded parts, embedded parts to ensure the correct size, shape regular, welding meet the design requirements. On-site production of embedded parts, usually its plate thickness of not less than 8mm, Anchorage less than 4, a diameter of not less than 8mm. Above all finishing work based on actual problems encountered students from, for reference, any questions, please timely communication, correct me. Building embedded parts _ Peter Kennedy Building Materials (certified) _ embedded parts supplied by Nanjing Building Materials Co., Peter Kennedy. Building Materials Co., Ltd. Nanjing Kuang Jian (www.njwklg.com) is Nanjing, metal building materials leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Peter Kennedy leadership in building materials with the staff warmly welcome all inquiries negotiations to create the Marina building materials firm a better future. |
Admin>>>
You are the 30350 visitor
Copyright © GuangDong ICP No. 10089450, Peter Kennedy Building Materials Co., Ltd. Nanjing All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30350 visitor
Copyright © GuangDong ICP No. 10089450, Peter Kennedy Building Materials Co., Ltd. Nanjing All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

